COMPLETED SHUTDOWNS



  • Shutdown Projects

    Replacement of 2 Nos NITROGEN GENERATION PACKAGES



    Description: Petrofac Emirates LLC has recently awarded a shutdown for the duration of two months at CS-4 ADCO, Habshan for the Replacement of Nitrogen Generation Packages. The scope includes the removal of old & redundant two Packages by Jacking, Rigging, Lifting & Transportation from the process shed area & Installation of Two new Nitrogen Generation Packages at the same foundation. This also includes excavation of cable trenches, Civil works for the existing foundation with new cabling of Electrical & Instrumentation with other allied services like Piping, Pre-commissioning and vendors support for Commissioning i.e. Bluetek, Schneider & Yokogava. The work is in progress through ADNOC approved Method Statements, Task Risk Assessments and the Rigging Studies & Rigging plans. Two Old Units are already been replaced with the New Nitrogen generation Module Plants and other allied services i.e. Piping, Electrical & Instrumentation is in progress to the entire satisfaction of EPC Contractor “Petrofac” and the owner “Adnoc Company for Onshore Operation.
  • Shutdown Projects

    GHALILAH POWER PLANT RAS-AL-KHAMAH



    Description: The job for the replacement of Duplex piping & Membrane Headers modification is recently been awarded at Ghalilah Power Plant in Ras-Al-Khamah. The works includes the replacement of old & redundant existing piping with Duplex material and major modification of water membrane Headers for water treatment plant. Fixshine General Contracting has approved all the Welding Procedures, Welders Qualification tests (WPS & WQT) and other quality requirement. All the piping & modification works requires 100 percent Radiography and Hydrotest.
S.NO. PROJECT NAME EPC / MAIN CONTRACTOR CONTRACTOR SCOPE OF WORKS /SPECIFICATIONS TOTAL ORDER VALUE (AED) STATUS YEAR
1 ADNOC REFINING CRUDE FLEXIBILITY PROJECT ADNOC SAMSUNG ENGINEERING PIPING & WELDING WORK AT CRUDE FLEXIBILITY PROJECT 3,928,040/- CONTINUE 2022
2 EPC FOR QUSAHWIRA FIELD DEVELOPMENT PHASE II PROJECT ADCO PETROFAC EMIRATES LLC PIPING & STRUCTURAL STEEL WORK 11,614,001.26/- CONTINUE 2020/2021
3 EPCL REFINERY TURNAROUND & INSPECTION SHUTDOWN WORK ENOC DESCON ENGINEERING MAINTENANCE OF EPCL REFINERY TURNAROUND & INSPECTION SHUTDOWN 2022 PACKAGES - 02 1,032,000/- CONTINUE 2022
4 MIRFA POWER PLANT TRANSCO METITO OVERSEAS LLC INSTALLATION & ERECTION OF STEEL STRUCTURE, INSTALLATION OF VALVES & SURGE VESSELS, INSTALLATION OF LADDER & PLAT FORM FOR DISCHARGE SURGE VESSEL 1,200,000/- CONTINUE 2022
5 PROVISION OF OFFSTREAM INSPECTION SERVICES FOR TANK CDS FST-802 AND DEGASSING BOOT-702 AT BUHASA ADNOC RACO GENERAL TRANSPORT & ESTABLISHMENT TANK BOTTOM PLATE REPAIR WORK - FABRICATION & WELDING OF STEEL PLATE PATCHES. 2,200,000/- CONTINUE 2022
6 EXPANSION OF BAB GAS COMPRESSION PROJECT PHASE 2 ADCO PETROFAC EMIRATES LLC REPLACEMENT OF NITROGEN GENERATION PACKAGES WITH ALLIED WORKS 2,018,500/- CONTINUE 2021
7 EPC FOR QUSAHWIRA FIELD DEVELOPMENT PHASE II PROJECT ADCO CHINA STATE CONTRUCTION LLC PIPING, INSTRUMENTATION, ELECTRICAL AND STRUCTURE STEEL WORK 13,712,271.82/- COMPLETED 2020
8 HALIBA DEVEOPMENT PROJECT AL DHAFRA PETROLEUM OPERATIONSCO. Ltd. L&T HYDROCARBON ENGINEERING PIPELINE FABRICATION & WELDING-DOWNHILL WELDING OF PIPELINE. 1,505,197.71/- COMPLETED 2019
9 PE-102 HABSHAN PETROFAC -ADCO - ABU DHABI DOME DZ INTERNATIONAL REPAIR OF INTERNAL LINING OF 2 NOS. PRODUCTION SEPARATORS. MAINTENANCE OF DIFFERENT VESSELS AND MODIFICATION OF LT SCRUBBERS. 1,574,430/- COMPLETED 2018
10 HABSHAN-5 GAS DEVELOPMENT GASCO TECHNICAS REUNIDAS PIPE FABRICATION AND ERECTION WORK. 5,267,908.18 COMPLETED 2018
11 RDS – 4 HABSHAN PETROFAC -ADCO - ABU DHABI DOME DZ INTERNATIONAL MAINTENANCE OF VESSELS AND OTHER MISC. JOBS. 874,694/- COMPLETED 2019
12 MUSSAFFAH WORKSHOP ADNOC EMARAT ALOULA INDUSTRIES LLC PIPING & STRUCTURAL FABRICATION AND ERECTION. 759,720/- COMPLETED 2019/2020
13 DABBIYA OFFSHORE CLUSTER & PIELINE PROJECT ADCO ARCHIRODON CONSTRUCTION (OVERSEAS) CO. S. A./ADNOC OFFSHORE FABRICATION & ERECTION OF PIPING & STRUCTURAL STEEL FABRICATION & ERECTION WORKS. 874,159.85/- COMPLETED 2018
14 INTEGRATED GAS DEVELOPMENT EXPANSION (IGD-E) PROJECT – PHASE 1, ONSHORE PIPELINE AND HABSHAN ADNOC CONTROL & APPLICATIONS EMIRATES STEEL STRUCTURAL WORKS AND ERECTION OF STRUCTURAL ELEMENTS 1200 TON. 3,546,829.84/- COMPLETED 2017
15 SATAH AL RAZBOOT (SARB) FIELD DEVELOPMENT PROJECT – PACKAGE 4 EPC WORK ADMA HYUNDAI ENGINEERING & CONSTRUCTION / ADNOC MARINE TECHNICAL SUPPORT FOR PIPING ERECTION WORKS. 944,810.23/- COMPLETED 2018
16 INTEGRATED GAS DEVELOPMENT EXPANSION (IGD-E) PROJECT – PHASE 1, ONSHORE PIPELINE AND HABSHAN ADNOC AL ASAB GENERAL TRANSPORT AND CONTRACTING/ADNOC GAS PROCESSING, HABSHAN-5 PLANT UNDERGROUND GRE PIPING INSTALLATION FOR AOC & OD SYSTEM, AS PER ADDENDUM TO GASCO SPECIFICATION. 1,579,880.49/- COMPLETED 2017/2018
17 EPC FOR RUMAITHA / SHANAYEL FACILITIES – PHASE -III ADNOC AL HASSAN ENGINEERING CO./ADNOC ONSHORE GRE PIPE FABRICATION AND ERECTION WORKS – (7,989 DIA INCHES OF LAMINATION/BONDING WORKS) 2,265,840/- COMPLETED 2018
18 SATAH AL RAZBOOT (SARB) FIELD DEVELOPMENT PROJECT – PACKAGE 4 EPC WORK ADMA DAEAH ENGINEERING & CONSTRUCTION/ADNOC MARINE PIPING (GRE AND STEEL) FABRICATION & ERECTION WORKS. 1,439,853.50/- COMPLETED 2018
19 ADNOC AL-RUWAIS HOUSING PROJECT ADNOC AL-SHAMAT GROUP / DHABI CONTRACTING LLC ELECTRICAL, PLUMBING & HVAC WORKS 3,578,263/- COMPLETED 2017/2018
20 INTEGRATED GAS DEVELOPMENT EXPANSION (IGD-E) PROJECT – PHASE 1, ONSHORE PIPELINE AND HABSHAN MODIFICATIONS ADNOC AL ASAB GENERAL TRANSPORT AND CONTRACTING / ADNOC GAS PROCESSING, HABSHAN-5 PLANT RE-ROUTING OF 16”, 12” AND 8” PIPES WORKS – GRE PIPE RE-ROUTING IN BROWN FIELD 1,589,512/- COMPLETED 2017
21 MUSSAFAH YARD ADNOC TECHNOMAK ENERGY LLC STRUCTURE FABRICATION AND ERECTION WORK. 972,075.83/- COMPLETED 2016/2017
22 TAKREER NORM FACILITY PROJECT - RUWAIS ADNOC GHANTOOT TRANSPORT & GENERAL CONTRACTING LLC (OIL & GAS DIVISION) INSTALLATION OF GRE PIPE WITH FITTINGS UNDERGROUND PIPING SYSTEM. 1,840,080/- COMPLETED 2015/2016
23 YAS FAMILY HILTON HOTEL – YAS ISLAND SANJOSE CONTRACTING GREEN ADEP TECHNICAL SERVICES LLC FABRICATION AND ERECTION OF STEEL STRUCTURE. 1,522,040.89/- ONGOING 2019/2020
24 AL WASL PLAZA EXPO 2020 - DUBAI Laing O'Rourke GREEN ADEP TECHNICAL SERVICES LLC HVAC WORK FAMILY HOTEL – YAS ISLAND 1,438,554.2/- ONGOING 2019/2020
25 JEWEL OF THE CREEK DEVEOPMENT DUBAI INTERNATIONAL REAL ESTATE (D.I.R.E) BIC CONTRACTING LLC FABRICATION & ERECTION OF PIPING. 1,216,416.67/- COMPLETED 2018
26 MUSSAFAH YARD ARAMCO GULF PIPING CO. WLL STRUCTURE FABRICATION AND ERECTION WORK. 1,504,870.11/- COMPLETED 2018/2019
27 TAWEELA POWER PLANT TOTAL TRACTEBEL EMIRATES O&M COMPANY (TTE O&M) AAF INTERNATIONAL LLC REPAIR WORK AT TAWEELAH A1 ON GT# 12, 13, 14, 15, 16 EXHAUST PLENUM REPLACEMENT & EXHAUST SILENCER REFURBISHMENT. 679,535/- COMPLETED 2019/2020
28 YAS SOUTH INTEGRATED DESTINATION RESORT ARENA – YAS ISLAND BAM INTERNATIONAL ABU DHABI LLC AL REYAMI INTERNATIONAL STEEL TECH. LLC ERECTION OF STEEL STRUCTURE & EQUIPMENT. 485,176.85/- COMPLETED 2019
29 KHALIFA PORT TERMINAL PHASE 2 – ABU DHABI ARABIAN CONSTRUCTION COMPANY (ACC) CHINA HARBOUR ENGINEERING CO. LLC FABRICATION AND ERECTION OF STEEL STRUCTURE. 388,788.33/- COMPLETED 2019
30 UMM AL NAAR POWER PLANT –ABU DHABI UMM AL NAAR POWER PLANT MULTILINE EMPLOYEES PROVISION SERVICES FABRICATION AND ERECTION WORK. 1,203,815/- COMPLETED 2018/2019
31 ADEEN POWER PLANT PHASE 1 PESCO AARYA ENGINEERING FZC LCO TREATED TANK FABRICATION & WELDING 438,429.40 COMPLETED 2019
32 JEWEL OF THE CREEK DEVELOPMENT DUBAI INTERNATIONAL REAL ESTATE (D.I.R.E) MEGAMEC MECHANICAL & ELECTRICAL CONTRACTING PIPE WELDING WORK. 514,463/- COMPLETED 2019
33 TOWN SQUARE DEVELOPMENT, PKG-04, DUBAI EMAAR STEEL CONSTRUCTION ENGINEERING COMPANY LLC PIPING FABRICATION, PIPING ERECTION, STEEL STRUCTURE INSTALLATION AND EQUIPMENT INSTALLATION. 7,592,617.75/- COMPLETED 2017/2018
34 AL GHADEER DEVELOPMENT PHASE 2 PROJECT - DUBAI LBCG CONSTRUCTION LOOTAH BS GAS PIPE FABRICATION AND ERECTION WORK. 533,437.46/- COMPLETED 2018
35 UMM AL NAAR POWER PLANT UMM AL NAAR POWER PLANT MULTI LINE EMPLOYEES PROVISION SERVICES FABRICATION AND ERECTION WORK OF PIPING. 821,479.17/- COMPLETED 2017
36 MIRFA INDEPENDENT WATER & POWER PLANT (IWPP) PROJECT MIRFA POWER PLANT HYUNDAI ENGINEERING & CONSTRUCTION/ AL MIRFA POWER COMPANY - AMPC CONSULTANCY AND SUPERVISION OF MECHANICAL WORKS, IRON WORK FOR STEEL STRUCTURE, PIPE FITTING WORKS, INSTALLATION OF MECHANICAL EQUIPMENT’S, FABRICATION AND ERECTION OF CS AND SS PIPING, MISCELLANEOUS CONSTRUCTION SERVICES 1,659,607.99/- COMPLETED 2016/2017
37 TOWN SQUARE DEVELOPMENT, PKG-04 , DUBAI EMAAR STEEL CONSTRUCTION ENGINEERING COMPANY LLC CHILLED WATER NETWORK, PIPING FABRICATION & INSTALLATION 2,645,500/- COMPLETED 2016/2017
38 INDEPENDENT WATER & POWER PLANT, MIRFA INCO GROUP/ AL MIRFA POWER COMPAY - AMPC INCO GROUP FIRE FIGHTING NETWORK, PIPING FABRICATION & INSTALLATION 1,847,249/- COMPLETED 2016
39 DENHOLM YAM MUSSFAH WORKSHOP MUSSAFFAJ YARD DENHOLM YAM CONTRACTING COMPANY L.L.C. FABRICATION OF PIPING & STEEL STRUCTURE IN MUSSAFFAH WORKSHOP 727,650/- COMPLETED 2016
40 MUSSAFAH WORKSHOP SERGAS GROUP KASHMIR MECHANICAL CONTRACTING LLC PIPE FABRICATION & ERECTION WORK AT INTERNATIONAL GAS SERVICE EST. 962,265/- COMPLETED 2015/2016