    EPCL REFINERY TURNAROUND & INSPECTION SHUTDOWN WORK

    Client: ENOC/DESCON ENGINEERING

    Scope of Works/Specification: MAINTENANCE OF EPCL REFINERY TURNAROUND & INSPECTION SHUTDOWN 2022 PACKAGES - 02
  • Completed Projects

    EPC FOR QUSAHWIRA FIELD DEVELOPMENT PHASE II PROJECT

    Client: ADCO/CHINA STATE CONTRUCTION LLC

    Scope of Works/Specification: PIPING, INSTRUMENTATION, ELECTRICAL AND STRUCTURE STEEL WORK
  • Completed Projects

    HALIBA DEVEOPMENT PROJECT

    Client: AL DHAFRA PETROLEUM OPERATIONSCO. Ltd./L&T HYDROCARBON ENGINEERING

    Scope of Works/Specification: PIPELINE FABRICATION & WELDING-DOWNHILL WELDING OF PIPELINE.
  • Completed Projects

    PE-102 HABSHAN

    Client: PETROFAC -ADCO - ABU DHABI/DOME DZ INTERNATIONAL

    Scope of Works/Specification: REPAIR OF INTERNAL LINING OF 2 NOS. PRODUCTION SEPARATORS. MAINTENANCE OF DIFFERENT VESSELS AND MODIFICATION OF LT SCRUBBERS.
  • Completed Projects

    HABSHAN-5 GAS DEVELOPMENT

    Client: GASCO/TECHNICAS REUNIDAS

    Scope of Works/Specification: PIPE FABRICATION AND ERECTION WORK.
  • Completed Projects

    RDS – 4 HABSHAN

    Client: PETROFAC - ADCO - ABU DHABI/DOME DZ INTERNATIONAL

    Scope of Works/Specification: TENANCE OF VESSELS AND OTHER MISC. JOBS.
  • Completed Projects

    MUSSAFFAH WORKSHOP

    Client: ADNOC/EMARAT ALOULA INDUSTRIES LLC

    Scope of Works/Specification: PIPING & STRUCTURAL FABRICATION AND ERECTION.
  • Completed Projects

    DABBIYA OFFSHORE CLUSTER & PIELINE PROJECT

    Client: ADCO/ARCHIRODON CONSTRUCTION (OVERSEAS) CO. S. A./ADNOC OFFSHORE

    Scope of Works/Specification: FABRICATION & ERECTION OF PIPING & STRUCTURAL STEEL FABRICATION & ERECTION WORKS.
  • Completed Projects

    INTEGRATED GAS DEVELOPMENT EXPANSION (IGD-E) PROJECT – PHASE 1, ONSHORE PIPELINE AND HABSHAN

    Client: ADNOC/CONTROL & APPLICATIONS EMIRATES

    Scope of Works/Specification: STEEL STRUCTURAL WORKS AND ERECTION OF STRUCTURAL ELEMENTS 1200 TON.
  • Completed Projects

    SATAH AL RAZBOOT (SARB) FIELD DEVELOPMENT PROJECT – PACKAGE 4 EPC WORK

    Client: ADMA/HYUNDAI ENGINEERING & CONSTRUCTION / ADNOC MARINE

    Scope of Works/Specification: TECHNICAL SUPPORT FOR PIPING ERECTION WORKS.
  • Completed Projects

    INTEGRATED GAS DEVELOPMENT EXPANSION (IGD-E) PROJECT – PHASE 1, ONSHORE PIPELINE AND HABSHAN

    Client: ADNOC/AL ASAB GENERAL TRANSPORT AND CONTRACTING/ADNOC GAS PROCESSING, HABSHAN-5 PLANT

    Scope of Works/Specification: UNDERGROUND GRE PIPING INSTALLATION FOR AOC & OD SYSTEM, AS PER ADDENDUM TO GASCO SPECIFICATION.
  • Completed Projects

    EPC FOR RUMAITHA / SHANAYEL FACILITIES – PHASE -III

    Client: ADCO/AL HASSAN ENGINEERING CO./ADNOC ONSHORE

    Scope of Works/Specification: GRE PIPE FABRICATION AND ERECTION WORKS – (7,989 DIA INCHES OF LAMINATION/BONDING WORKS)
  • Completed Projects

    SATAH AL RAZBOOT (SARB) FIELD DEVELOPMENT PROJECT – PACKAGE 4 EPC WORK

    Client: ADMA/DAEAH ENGINEERING & CONSTRUCTION/ADNOC MARINE

    Scope of Works/Specification: PIPING (GRE AND STEEL) FABRICATION & ERECTION WORKS.
  • Completed Projects

    ADNOC AL-RUWAIS HOUSING PROJECT

    Client: ADNOC/AL-SHAMAT GROUP / DHABI CONTRACTING LLC

    Scope of Works/Specification: ELECTRICAL, PLUMBING & HVAC WORKS
  • Completed Projects

    INTEGRATED GAS DEVELOPMENT EXPANSION (IGD-E) PROJECT – PHASE 1, ONSHORE PIPELINE AND HABSHAN MODIFICATIONS

    Client: ADNOC/AL ASAB GENERAL TRANSPORT AND CONTRACTING / ADNOC GAS PROCESSING, HABSHAN- 5 PLANT

    Scope of Works/Specification: RE-ROUTING OF 16”, 12” AND 8” PIPES WORKS – GRE PIPE RE-ROUTING IN BROWN FIELD
  • Completed Projects

    MUSSAFAH YARD

    Client: ADNOC/TECHNOMAK ENERGY LLC

    Scope of Works/Specification: STRUCTURE FABRICATION AND ERECTION WORK.
  • Completed Projects

    TAKREER NORM FACILITY PROJECT - RUWAIS

    Client: ADNOC/GHANTOOT TRANSPORT & GENERAL CONTRACTING LLC (OIL & GAS DIVISION)

    Scope of Works/Specification: INSTALLATION OF GRE PIPE WITH FITTINGS UNDERGROUND PIPING SYSTEM.
  • Completed Projects

    YAS FAMILY HILTON HOTEL – YAS ISLAND

    Client: SANJOSE CONTRACTING/GREEN ADEP TECHNICAL SERVICES LLC

    Scope of Works/Specification: FABRICATION AND ERECTION OF STEEL STRUCTURE
  • Completed Projects

    AL WASL PLAZA EXPO 2020 - DUBAI

    Client: Laing O'Rourke/GREEN ADEP TECHNICAL SERVICES LLC

    Scope of Works/Specification: HVAC WORK FAMILY HOTEL – YAS ISLAND
  • Completed Projects

    JEWEL OF THE CREEK DEVEOPMENT

    Client: DUBAI INTERNATIONAL REAL ESTATE (D.I.R.E)/BIC CONTRACTING LLC

    Scope of Works/Specification: FABRICATION & ERECTION OF PIPING
  • Completed Projects

    MUSSAFAH YARD

    Client: ARAMCO/GULF PIPING CO. WLL

    Scope of Works/Specification: STRUCTURE FABRICATION AND ERECTION WORK.
  • Completed Projects

    TAWEELA POWER PLANT

    Client: TOTAL TRACTEBEL EMIRATES O&M COMPANY (TTE O&M)/AAF INTERNATIONAL LLC

    Scope of Works/Specification: REPAIR WORK AT TAWEELAH A1 ON GT# 12, 13, 14, 15, 16 EXHAUST PLENUM REPLACEMENT & EXHAUST SILENCER REFURBISHMENT.
  • Completed Projects

    YAS SOUTH INTEGRATED DESTINATION RESORT ARENA – YAS ISLAND

    Client: BAM INTERNATIONAL ABU DHABI LLC/AL REYAMI INTERNATIONAL STEEL TECH. LLC

    Scope of Works/Specification: ERECTION OF STEEL STRUCTURE & EQUIPMENT.
  • Completed Projects

    KHALIFA PORT TERMINAL PHASE 2 – ABU DHABI

    Client: ARABIAN CONSTRUCTION COMPANY (ACC)/CHINA HARBOUR ENGINEERING CO. LLC

    Scope of Works/Specification: FABRICATION AND ERECTION OF STEEL STRUCTURE.
  • Completed Projects

    UMM AL NAAR POWER PLANT –ABU DHABI

    Client: UMM AL NAAR POWER PLANT/MULTILINE EMPLOYEES PROVISION SERVICES

    Scope of Works/Specification: FABRICATION AND ERECTION WORK.
  • Completed Projects

    ADEEN POWER PLANT PHASE 1

    Client: PESCO/AARYA ENGINEERING FZC

    Scope of Works/Specification: LCO TREATED TANK FABRICATION & WELDING
  • Completed Projects

    JEWEL OF THE CREEK DEVELOPMENT

    Client: DUBAI INTERNATIONAL REAL ESTATE (D.I.R.E)/MEGAMEC MECHANICAL & ELECTRICAL CONTRACTING

    Scope of Works/Specification: PIPE WELDING WORK.
  • Completed Projects

    TOWN SQUARE DEVELOPMENT, PKG- 04, DUBAIT

    Client: EMAAR/STEEL CONSTRUCTION ENGINEERING COMPANY LLCC

    Scope of Works/Specification: PIPING FABRICATION, PIPING ERECTION, STEEL STRUCTURE INSTALLATION AND EQUIPMENT INSTALLATION
  • Completed Projects

    AL GHADEER DEVELOPMENT PHASE 2 PROJECT - DUBAI

    Client: LBCG CONSTRUCTION/LOOTAH BS GAS

    Scope of Works/Specification: PIPE FABRICATION AND ERECTION WORK
  • Completed Projects

    UMM AL NAAR POWER PLANT

    Client: UMM AL NAAR POWER PLANT/MULTI LINE EMPLOYEES PROVISION SERVICES

    Scope of Works/Specification: FABRICATION AND ERECTION WORK OF PIPING.
  • Completed Projects

    DESALINATION PLANT AT UMM AL QUWAIN

    Client: NAQAA DESALINATION PLANT LLC

    Scope of Works/Specification: INSTALLATION OF GRP PIPING (SIZE2” TO 1210 DIA). TOTAL EXECUTED QUANTITY 20,000 INCH DIA.
  • Completed Projects

    MIRFA INDEPENDENT WATER & POWER PLANT (IWPP) PROJECT

    Client: MIRFA POWER PLANT/HYUNDAI ENGINEERING & CONSTRUCTION/ AL MIRFA POWER COMPANY - AMPC

    Scope of Works/Specification: CONSULTANCY AND SUPERVISION OF MECHANICAL WORKS IRON WORK FOR STEEL STRUCTURE PIPE FITTING WORKS INSTALLATION OF MECHANICAL EQUIPMENT’S FABRICATION AND ERECTION OF CS AND SS PIPING MISCELLANEOUS CONSTRUCTION SERVICES
  • Completed Projects

    TOWN SQUARE DEVELOPMENT, PKG- 04, DUBAI

    Client: EMAAR/STEEL CONSTRUCTION ENGINEERING COMPANY LLC

    Scope of Works/Specification: CHILLED WATER NETWORK, PIPING FABRICATION & INSTALLATION
  • Completed Projects

    INDEPENDENT WATER & POWER PLANT, MIRFA

    Client: INCO GROUP/ AL MIRFA POWER COMPAY - AMPC

    Scope of Works/Specification: FIRE FIGHTING NETWORK, PIPING FABRICATION & INSTALLATION
  • Completed Projects

    DENHOLM YAM MUSSFAH WORKSHOP

    Client: MUSSAFFAJ YARD/DENHOLM YAM CONTRACTING COMPANY L.L.C.

    Scope of Works/Specification: FABRICATION OF PIPING & STEEL STRUCTURE IN MUSSAFFAH WORKSHOP
  • Completed Projects

    MUSSAFAH WORKSHOP

    Client: SERGAS GROUP/KASHMIR MECHANICAL CONTRACTING LLC

    Scope of Works/Specification: PIPE FABRICATION & ERECTION WORK AT INTERNATIONAL GAS SERVICE EST.
S.NO. PROJECT NAME EPC / MAIN CONTRACTOR CONTRACTOR SCOPE OF WORKS /SPECIFICATIONS TOTAL ORDER VALUE (AED) STATUS YEAR
1 ADNOC REFINING CRUDE FLEXIBILITY PROJECT ADNOC SAMSUNG ENGINEERING PIPING & WELDING WORK AT CRUDE FLEXIBILITY PROJECT 3,928,040/- CONTINUE 2022
2 EPC FOR QUSAHWIRA FIELD DEVELOPMENT PHASE II PROJECT ADCO PETROFAC EMIRATES LLC PIPING & STRUCTURAL STEEL WORK 11,614,001.26/- CONTINUE 2020/2021
3 EPCL REFINERY TURNAROUND & INSPECTION SHUTDOWN WORK ENOC DESCON ENGINEERING MAINTENANCE OF EPCL REFINERY TURNAROUND & INSPECTION SHUTDOWN 2022 PACKAGES - 02 1,032,000/- CONTINUE 2022
4 MIRFA POWER PLANT TRANSCO METITO OVERSEAS LLC INSTALLATION & ERECTION OF STEEL STRUCTURE, INSTALLATION OF VALVES & SURGE VESSELS, INSTALLATION OF LADDER & PLAT FORM FOR DISCHARGE SURGE VESSEL 1,200,000/- CONTINUE 2022
5 PROVISION OF OFFSTREAM INSPECTION SERVICES FOR TANK CDS FST-802 AND DEGASSING BOOT-702 AT BUHASA ADNOC RACO GENERAL TRANSPORT & ESTABLISHMENT TANK BOTTOM PLATE REPAIR WORK - FABRICATION & WELDING OF STEEL PLATE PATCHES. 2,200,000/- CONTINUE 2022
6 EXPANSION OF BAB GAS COMPRESSION PROJECT PHASE 2 ADCO PETROFAC EMIRATES LLC REPLACEMENT OF NITROGEN GENERATION PACKAGES WITH ALLIED WORKS 2,018,500/- CONTINUE 2021
7 EPC FOR QUSAHWIRA FIELD DEVELOPMENT PHASE II PROJECT ADCO CHINA STATE CONTRUCTION LLC PIPING, INSTRUMENTATION, ELECTRICAL AND STRUCTURE STEEL WORK 13,712,271.82/- COMPLETED 2020
8 HALIBA DEVEOPMENT PROJECT AL DHAFRA PETROLEUM OPERATIONSCO. Ltd. L&T HYDROCARBON ENGINEERING PIPELINE FABRICATION & WELDING-DOWNHILL WELDING OF PIPELINE. 1,505,197.71/- COMPLETED 2019
9 PE-102 HABSHAN PETROFAC -ADCO - ABU DHABI DOME DZ INTERNATIONAL REPAIR OF INTERNAL LINING OF 2 NOS. PRODUCTION SEPARATORS. MAINTENANCE OF DIFFERENT VESSELS AND MODIFICATION OF LT SCRUBBERS. 1,574,430/- COMPLETED 2018
10 HABSHAN-5 GAS DEVELOPMENT GASCO TECHNICAS REUNIDAS PIPE FABRICATION AND ERECTION WORK. 5,267,908.18 COMPLETED 2018
11 RDS – 4 HABSHAN PETROFAC -ADCO - ABU DHABI DOME DZ INTERNATIONAL MAINTENANCE OF VESSELS AND OTHER MISC. JOBS. 874,694/- COMPLETED 2019
12 MUSSAFFAH WORKSHOP ADNOC EMARAT ALOULA INDUSTRIES LLC PIPING & STRUCTURAL FABRICATION AND ERECTION. 759,720/- COMPLETED 2019/2020
13 DABBIYA OFFSHORE CLUSTER & PIELINE PROJECT ADCO ARCHIRODON CONSTRUCTION (OVERSEAS) CO. S. A./ADNOC OFFSHORE FABRICATION & ERECTION OF PIPING & STRUCTURAL STEEL FABRICATION & ERECTION WORKS. 874,159.85/- COMPLETED 2018
14 INTEGRATED GAS DEVELOPMENT EXPANSION (IGD-E) PROJECT – PHASE 1, ONSHORE PIPELINE AND HABSHAN ADNOC CONTROL & APPLICATIONS EMIRATES STEEL STRUCTURAL WORKS AND ERECTION OF STRUCTURAL ELEMENTS 1200 TON. 3,546,829.84/- COMPLETED 2017
15 SATAH AL RAZBOOT (SARB) FIELD DEVELOPMENT PROJECT – PACKAGE 4 EPC WORK ADMA HYUNDAI ENGINEERING & CONSTRUCTION / ADNOC MARINE TECHNICAL SUPPORT FOR PIPING ERECTION WORKS. 944,810.23/- COMPLETED 2018
16 INTEGRATED GAS DEVELOPMENT EXPANSION (IGD-E) PROJECT – PHASE 1, ONSHORE PIPELINE AND HABSHAN ADNOC AL ASAB GENERAL TRANSPORT AND CONTRACTING/ADNOC GAS PROCESSING, HABSHAN-5 PLANT UNDERGROUND GRE PIPING INSTALLATION FOR AOC & OD SYSTEM, AS PER ADDENDUM TO GASCO SPECIFICATION. 1,579,880.49/- COMPLETED 2017/2018
17 EPC FOR RUMAITHA / SHANAYEL FACILITIES – PHASE -III ADNOC AL HASSAN ENGINEERING CO./ADNOC ONSHORE GRE PIPE FABRICATION AND ERECTION WORKS – (7,989 DIA INCHES OF LAMINATION/BONDING WORKS) 2,265,840/- COMPLETED 2018
18 SATAH AL RAZBOOT (SARB) FIELD DEVELOPMENT PROJECT – PACKAGE 4 EPC WORK ADMA DAEAH ENGINEERING & CONSTRUCTION/ADNOC MARINE PIPING (GRE AND STEEL) FABRICATION & ERECTION WORKS. 1,439,853.50/- COMPLETED 2018
19 ADNOC AL-RUWAIS HOUSING PROJECT ADNOC AL-SHAMAT GROUP / DHABI CONTRACTING LLC ELECTRICAL, PLUMBING & HVAC WORKS 3,578,263/- COMPLETED 2017/2018
20 INTEGRATED GAS DEVELOPMENT EXPANSION (IGD-E) PROJECT – PHASE 1, ONSHORE PIPELINE AND HABSHAN MODIFICATIONS ADNOC AL ASAB GENERAL TRANSPORT AND CONTRACTING / ADNOC GAS PROCESSING, HABSHAN-5 PLANT RE-ROUTING OF 16”, 12” AND 8” PIPES WORKS – GRE PIPE RE-ROUTING IN BROWN FIELD 1,589,512/- COMPLETED 2017
21 MUSSAFAH YARD ADNOC TECHNOMAK ENERGY LLC STRUCTURE FABRICATION AND ERECTION WORK. 972,075.83/- COMPLETED 2016/2017
22 TAKREER NORM FACILITY PROJECT - RUWAIS ADNOC GHANTOOT TRANSPORT & GENERAL CONTRACTING LLC (OIL & GAS DIVISION) INSTALLATION OF GRE PIPE WITH FITTINGS UNDERGROUND PIPING SYSTEM. 1,840,080/- COMPLETED 2015/2016
23 YAS FAMILY HILTON HOTEL – YAS ISLAND SANJOSE CONTRACTING GREEN ADEP TECHNICAL SERVICES LLC FABRICATION AND ERECTION OF STEEL STRUCTURE. 1,522,040.89/- ONGOING 2019/2020
24 AL WASL PLAZA EXPO 2020 - DUBAI Laing O'Rourke GREEN ADEP TECHNICAL SERVICES LLC HVAC WORK FAMILY HOTEL – YAS ISLAND 1,438,554.2/- ONGOING 2019/2020
25 JEWEL OF THE CREEK DEVEOPMENT DUBAI INTERNATIONAL REAL ESTATE (D.I.R.E) BIC CONTRACTING LLC FABRICATION & ERECTION OF PIPING. 1,216,416.67/- COMPLETED 2018
26 MUSSAFAH YARD ARAMCO GULF PIPING CO. WLL STRUCTURE FABRICATION AND ERECTION WORK. 1,504,870.11/- COMPLETED 2018/2019
27 TAWEELA POWER PLANT TOTAL TRACTEBEL EMIRATES O&M COMPANY (TTE O&M) AAF INTERNATIONAL LLC REPAIR WORK AT TAWEELAH A1 ON GT# 12, 13, 14, 15, 16 EXHAUST PLENUM REPLACEMENT & EXHAUST SILENCER REFURBISHMENT. 679,535/- COMPLETED 2019/2020
28 YAS SOUTH INTEGRATED DESTINATION RESORT ARENA – YAS ISLAND BAM INTERNATIONAL ABU DHABI LLC AL REYAMI INTERNATIONAL STEEL TECH. LLC ERECTION OF STEEL STRUCTURE & EQUIPMENT. 485,176.85/- COMPLETED 2019
29 KHALIFA PORT TERMINAL PHASE 2 – ABU DHABI ARABIAN CONSTRUCTION COMPANY (ACC) CHINA HARBOUR ENGINEERING CO. LLC FABRICATION AND ERECTION OF STEEL STRUCTURE. 388,788.33/- COMPLETED 2019
30 UMM AL NAAR POWER PLANT –ABU DHABI UMM AL NAAR POWER PLANT MULTILINE EMPLOYEES PROVISION SERVICES FABRICATION AND ERECTION WORK. 1,203,815/- COMPLETED 2018/2019
31 ADEEN POWER PLANT PHASE 1 PESCO AARYA ENGINEERING FZC LCO TREATED TANK FABRICATION & WELDING 438,429.40 COMPLETED 2019
32 JEWEL OF THE CREEK DEVELOPMENT DUBAI INTERNATIONAL REAL ESTATE (D.I.R.E) MEGAMEC MECHANICAL & ELECTRICAL CONTRACTING PIPE WELDING WORK. 514,463/- COMPLETED 2019
33 TOWN SQUARE DEVELOPMENT, PKG-04, DUBAI EMAAR STEEL CONSTRUCTION ENGINEERING COMPANY LLC PIPING FABRICATION, PIPING ERECTION, STEEL STRUCTURE INSTALLATION AND EQUIPMENT INSTALLATION. 7,592,617.75/- COMPLETED 2017/2018
34 AL GHADEER DEVELOPMENT PHASE 2 PROJECT - DUBAI LBCG CONSTRUCTION LOOTAH BS GAS PIPE FABRICATION AND ERECTION WORK. 533,437.46/- COMPLETED 2018
35 UMM AL NAAR POWER PLANT UMM AL NAAR POWER PLANT MULTI LINE EMPLOYEES PROVISION SERVICES FABRICATION AND ERECTION WORK OF PIPING. 821,479.17/- COMPLETED 2017
36 MIRFA INDEPENDENT WATER & POWER PLANT (IWPP) PROJECT MIRFA POWER PLANT HYUNDAI ENGINEERING & CONSTRUCTION/ AL MIRFA POWER COMPANY - AMPC CONSULTANCY AND SUPERVISION OF MECHANICAL WORKS, IRON WORK FOR STEEL STRUCTURE, PIPE FITTING WORKS, INSTALLATION OF MECHANICAL EQUIPMENT’S, FABRICATION AND ERECTION OF CS AND SS PIPING, MISCELLANEOUS CONSTRUCTION SERVICES 1,659,607.99/- COMPLETED 2016/2017
37 TOWN SQUARE DEVELOPMENT, PKG-04 , DUBAI EMAAR STEEL CONSTRUCTION ENGINEERING COMPANY LLC CHILLED WATER NETWORK, PIPING FABRICATION & INSTALLATION 2,645,500/- COMPLETED 2016/2017
38 INDEPENDENT WATER & POWER PLANT, MIRFA INCO GROUP/ AL MIRFA POWER COMPAY - AMPC INCO GROUP FIRE FIGHTING NETWORK, PIPING FABRICATION & INSTALLATION 1,847,249/- COMPLETED 2016
39 DENHOLM YAM MUSSFAH WORKSHOP MUSSAFFAJ YARD DENHOLM YAM CONTRACTING COMPANY L.L.C. FABRICATION OF PIPING & STEEL STRUCTURE IN MUSSAFFAH WORKSHOP 727,650/- COMPLETED 2016
40 MUSSAFAH WORKSHOP SERGAS GROUP KASHMIR MECHANICAL CONTRACTING LLC PIPE FABRICATION & ERECTION WORK AT INTERNATIONAL GAS SERVICE EST. 962,265/- COMPLETED 2015/2016